欧美成人精品三级网站,肥白大屁股bbwbbwhd,国产剧情国产精品一区,精品无人乱码高清在线观看

Wuxi Gotele Metal Products Co., Ltd : CN EN
Home >>News >>News of Construction and Building

Golden Gate Bridge: an Exceptional piece of Steel Engineering



San Francisco’s Golden Gate Bridge is one of the most iconic bridges in the world. It is a so-called suspension bridge: the deck is supported by vertical cables attached to upper larger cables, which -in turn- extend between supporting towers and are anchored at the ends.


The bridge’s construction begun in 1933 and gave chances of employment during the US’s Great Depression. The design was assigned to engineer Joseph Strauss. The constructions time took 4 years costing $35 million and featuring some extreme scenarios.


For example, 3.25 million cubic feet (92,030 cubic metres) of soil excavations were required for establishing the bridge’s anchorages and they are 12-floors tall! The divers had to submerge as deep as 90 feet (27.4 m) in the water to explode rocks and then remove the debris! Despite such difficulties, the bridge finally opened in 1937.


On-site construction of the suspension cables began in 1935. All the bridge’s cables are made of galvanized carbon steel wires and they were laid by a ‘spinning’ technique.


The two main cables alone account for 61,500 tons of weight load on the two 746-ft-tall (227 m) towers! The wires pass on top of the towers and are secured at each end in massive anchorages. The main cables measure 36.22 inches in diameter and they extend for 7,650 ft (2,332 m) each!


Such massive cables were manufactured by grouping together 61 bundles of wire. In turn, each of these is made up of 452 smaller wires, for a total of 27,572 cables! As for the vertical suspended cables, they tie the bridge’s deck to the main cables. There are 250 pairs of them; they are spaced 50 feet apart from each other and measure from 2 to 16 inches in diameter.  All of the vertical ropes were replaced between 1972 and 1976.


It is interesting how the Golden Gate Bridge ‘dances’ up and down depending on the temperature. Hot days with high temperature cause the metal to expand; steel cables elongate and the bridge’s deck lowers. This is especially visible in its central part. Moreover, painting the ‘Red Bridge’ is a non-stop task and of primary importance. In fact, the paint applied to the steel prevents both corrosion and rust that the air with high salt content in may cause.


At Wuxi Gotele Metal Corporation we are passionate about bridges engineering and infrastructure technologies. With the help of our experts we proudly supply products such as Steel Truss Bridge, Diagonal Span Arch Bridge and Compact Panel Bridge. For further information and a full list of products, please click here.

HomeTelProductsContact
CN EN
主站蜘蛛池模板: 黄网站色成年片在线观看| 久久综合九色综合97伊人| 激情欧美日韩一区二区| 日本黄网站免费| 在线播放免费人成视频在线观看| 97久久超碰国产精品2021| 欧美黑人异族videos| 肉体暴力强伦轩在线播放 | 成人精品免费视频在线观看| 成人av无码国产在线观看| a 'v片欧美日韩在线| 亚洲色欲色欲77777小说网站| 国产亚洲曝欧美不卡精品| 国精产品999国精产| 欧美日韩国产一区二区三区不卡 | 加勒比中文无码久久综合色| 国产a√精品区二区三区四区| 青青青青国产免费线在线观看| 国语对白刺激在线视频国产网红| 亚洲精品国产精品乱码不卡| 亚洲午夜无码久久久久蜜臀av| 亚洲 自拍 欧美 日韩 丝袜| 天堂网在线.www天堂在线资源| 国产精品青青青在线观看| 亚洲精品喷潮一区二区三区| 内射小寡妇无码| 日产无码中文字幕av| 久久婷婷六月综合色液啪| 国产av永久无码青青草原| 亚洲国产精品无码第一区二区三区 | 久久亚洲精品成人无码网站| 国产线观看免费观看| 青青国产线免观| 欧美性大战久久久久xxx| 久久综合给合久久狠狠狠97色69 | 精品亚洲aⅴ在线观看| 精品国产午夜理论片不卡精品| 日本在线一区二区三区欧美| 免费体验区试看120秒| 日本人妻人人人澡人人爽| 99久久亚洲精品日本无码|